Name | Kernkraftwerk Beznau |
---|---|
Operator | Axpo AG |
Enforcement organization 1 | Federal Council |
Enforcement organization 2 | Federal Department of the Environment, Transport, Energy and Communications DETEC |
Enforcement organization 3 | Swiss Federal Office of Energy SFOE |
Regulatory body | Swiss Federal Nuclear Safety Inspectorate ENSI |
License | Operating licenses for nuclear power plants (NPPs) in Switzerland are essentially granted on a permanent basis. NPPs can be operated as long as their security is ensured. Once the conditions for the safe operation of a nuclear power plant can no longer be guaranteed, the operating licence may be withdrawn at any time. If the decommissioning criteria under the DETEC Ordinance of 16 April 2008 on the Methodology and Standards for the Verification of the Criteria for the Provisional Decommissioning of Nuclear Power Plants are met, the licensed operator must decommission the plant immediately. |
Commune | Döttingen |
Canton | AG |
Reactor | Beznau 1 |
Life phase | Operation |
Reactor | Pressurised water reactor |
Cooling type | River water cooling system |
Nominal thermal output | 1130 MW |
Gross electrical output | 380 MWe |
Net electric output | 365 MWe |
Construction | 01.09.1965 - 16.07.1969 |
Operation phase | 01.09.1969 - |
Decommissioning | - |
Reactor | Beznau 2 |
Life phase | Operation |
Reactor | Pressurised water reactor |
Cooling type | River water cooling system |
Nominal thermal output | 1130 MW |
Gross electrical output | 380 MWe |
Net electric output | 365 MWe |
Construction | 01.01.1968 - 22.10.1971 |
Operation phase | 01.12.1971 - |
Decommissioning | - |